Retail Projects - Best Buy - West Jordan
Total Size:
30,000 Sq. Ft.Duration:
7 MonthsLocation:
West JordanEstimator/Project Manager:
Chris Joyal
The electrical work for this project involved purchasing and installing owner-specified equipment from national account vendors set up by the owner. Best Buy requires a very specific lighting layout and control. This store included a Magnolia Home Theater area with intricate lighting control and dimming. Power at the shelving was installed using a quick connect product. This method gives the store complete flexibility and provides for rapid changes to the display setup.
