Manufacturing/Warehouse Projects

AMT Labs
AMT Labs
AMT Labs was a design/build fast track project. The 77,400 square foot addition featured a two story office space, storage area, labs and production area. The production area consisted of mixing rooms, large oven for drying of products and grinding rooms. The grinding rooms consisted of a large dust collection system. more...

Conestoga
Conestoga Wood Specialties
The new Conestoga manufacturing facility located in Tooele, Utah utilizes the latest in wood manufacturing technology and was a design/build project. It features 115,000 square feet of both manufacturing and office space and includes two 4000 amp 480 volt 3-phase services. This facility has a large dust collection system that is powered by four 200HP motors, grinders, truck load and fire extinguishing system in the ducts and is all controlled via the motor control center and a programmable logic controller. There are over 100 different pieces of equipment to complete the manufacturing process. more...

Geneva Pipe Plant
Geneva Pipe Plant
Geneva Pipe was a new concrete pipe manufacturing plant design/build project. It consisted of 50,000 square feet of area and included both office and a manufacturing area. The building has 60' ceilings, automated cage machine, moving floor, drying kiln, 30 ton cranes, and mixers. The equipment was purchased from Germany and is a unique and one of a kind concrete manufacturing plant. more...